Until installation ALMAPLAST pipes are exposed to manipulation at loading and unloading, transport and temporary storage therefore it is necessary to pay attention to the correct way in their handling.
Immediately after the production pipes are placed and packed in original factory packaging, and pallets of standardized quantity and size. For this purpose, floor bars are used to lay pipes on, in order to prevent pipe contact with inadequate surface. Depending on the diameter and length of pipe two or three bars are used to ensure the stability of the connection and the ability to manipulate with forklift. Pipes inside the bundles are reinforced with pipe brushes. Entire bundle is secured with plastic strip that gives additional strength to the package.
|